bridges
This project for the Port Authority of NY & NJ involved the installation
of enclosures around the suspension cables within the four (4)
anchorage chambers (NY & NJ) of the George Washington Bridge
followed by installation of a Additionally, extensive structural modifications were performed together with the installation of cat walks to access the anchorage. Restoration work to deteriorated concrete surfaces was also required which involved concrete removal/replacement and the installation of a new wearing surface. Supplemental work on the bridge involved minor structural upgrades as well as placement of new asphalt wearing surface on sections of the bridge.
|